Landscape Works Packages for Developers and Main Contractors in Abu Dhabi: Scope, Standards, Water, Tender Documents, Handover and Liability
Landscape works packages for developers and main contractors in Abu Dhabi: scope, public realm standards, water, tender documents, handover and liability.
In short: On an Abu Dhabi development the landscape package usually covers softscape, hardscape, irrigation and its tie-ins, landscape lighting interfaces, water features and a maintenance period after handover, and it works best when it is defined early rather than squeezed in at the end. DMT's own documents reference the PR-401 Abu Dhabi Public Realm Design Manual and the ROW-603 Abu Dhabi Urban Street Design Manual, and since August 2026 DMT's Livability by Design framework applies to new or updated master plans for areas of more than 2,000 people. Water is a design constraint: DMT reports that seasonal irrigation cut irrigation water use by 75% in Al Dhafra, and Abu Dhabi City Municipality's 2026 walkway planting uses native species such as Ghaf. A good tender package states the drawings, specifications, BOQ, programme and interfaces, and asks for ICV certificates where relevant. Handover terms, including plant establishment, the defects period and maintenance, belong in the contract. Federal Decree-Law No. 25 of 2025, the new UAE Civil Code in force since 1 June 2026, keeps a ten-year decennial liability period and excludes those rules from the contractor-subcontractor relationship.
Petra Scape General Maintenance — a landscaping and grounds-maintenance company serving Al Ain and Abu Dhabi, UAE since 2003. Call 050 619 4614 or email info@petrascape.org for a free site visit and quote.
Overview
Landscaping is often the last package let on a development and the first one squeezed when the programme slips. That is a false economy. Irrigation mains, sleeves under roads and paving, tree pits, drainage falls and power for lighting and pumps all have to be coordinated with the civil and MEP works long before planting starts, and the landscape is what residents, tenants and authorities see first at handover. This guide is for developers, main contractors and consultants packaging landscape works on projects in Abu Dhabi. It covers what the package should include, the published frameworks that shape public realm design in the emirate, water and planting expectations, what to put in the tender, and how handover, defects and liability fit together. For choosing the subcontractor itself, see our landscape subcontractor prequalification checklist.
What a Landscape Works Package Covers
A landscape package is more than planting. Defining its boundaries clearly is the single most useful thing a developer or main contractor can do, because most disputes on landscape works come from interfaces nobody owned: who lays the sleeves, who provides the water and power points, who protects the finished work from other trades.
- Softscape: soil preparation, trees, palms, shrubs, ground cover and lawn or turf
- Hardscape: paving, kerbs, steps, walls, planters, shade structures and site furniture
- Irrigation: mainlines, laterals, valves, controllers, pump and tank interfaces, and connection to TSE or potable supply
- Lighting interfaces: cable sleeves, bases and fixtures where these sit in the landscape scope
- Water features, play areas and sports surfaces, where included
- Maintenance through the establishment and defects period, and any extended maintenance after it
Public Realm and Liveability Frameworks in Abu Dhabi
Public-facing landscape in Abu Dhabi is shaped by the emirate's design manuals and policy frameworks. The Department of Municipalities and Transport's Sahel Public Realm Rating System Handbook, a draft rating for accessibility and universal design in public spaces, references the PR-401 Abu Dhabi Public Realm Design Manual and the ROW-603 Abu Dhabi Urban Street Design Manual, and calls for universal design principles in landscaping and ample shade. On 24 August 2026 DMT launched the Livability by Design framework, which applies to new or updated master plans for areas of more than 2,000 people and aims for a high-quality public realm that supports healthier, more inclusive and resilient communities. Sustainability requirements under Estidama also apply to most developments; our Estidama Pearl rating guide covers the landscape side. For streets and shared spaces, see our streetscape landscaping guide.
- Confirm which manuals and rating systems the project's approvals refer to
- Design shade and accessible routes in from the start, not as an add-on
- Keep the landscape consultant's specification and the contractor's submittals aligned with the same documents
Water and Planting Expectations
Water use is the main constraint on landscape design in Abu Dhabi, and the authorities measure it. DMT reported that seasonal irrigation cut irrigation water use by 75% in Al Dhafra, and that residential green spaces there used 4.59 litres per square metre against a target of 8.0. Planting choices follow the same logic: Abu Dhabi City Municipality's 2026 programme of 5,000 trees along about 24 km of walkways uses native species known for their adaptability to the UAE climate, such as Ghaf. For a developer, that means specifying drought-tolerant and native planting, drip irrigation for shrubs and trees, controllers that allow seasonal schedules, and metering. Many projects also connect to treated sewage effluent; our TSE irrigation guide and central irrigation systems guide cover the infrastructure.
- Native and drought-tolerant planting as the default, with lawn limited to where it is used
- Drip irrigation for trees and shrubs, and hydrozoning by water need
- Controllers that support seasonal schedules, and meters on irrigation supplies
- A clear decision on TSE or potable supply, with the tie-in point and responsibility stated
What to Put in the Tender Package
A landscape tender priced on incomplete information comes back with qualifications, and every qualification becomes a variation later. The fuller the package, the closer the bids will be to each other and to the final account.
- Drawings: hardscape, softscape, irrigation and lighting layouts, with levels and details
- Specifications for soil, plant sizes and quality, materials and irrigation equipment
- A bill of quantities in the same structure as the drawings
- The programme, access dates by zone, and the planting window you expect
- An interface schedule: sleeves, water and power points, drainage connections and protection
- Handover requirements: plant establishment, defects period, maintenance and as-built records
- Prequalification documents requested, including the ICV certificate where the employer scores it
In-Country Value and Prequalification
On government and many semi-government projects, ICV certification affects tender evaluation. The UAE Government portal describes the National In-Country Value Program as one in which certified companies gain advantages during the awarding of tenders and contracts based on their ICV score. If ICV matters on your project, ask for the certificate at prequalification rather than at award. Our ICV certification guide explains how the score works for landscape contractors.
Handover, Defects and Decennial Liability
Landscape handover is different from building handover because the product keeps growing, or dying, after practical completion. The contract should say how long the contractor maintains the works after handover, what counts as a defect in planting (failed trees, dead shrubs, bare areas), how replacements are triggered and when final acceptance happens. Standard forms such as the FIDIC Red Book provide a defects notification mechanism; the period itself is set in the contract data, so state it rather than assume it. The legal background changed in 2026. Federal Decree-Law No. 25 of 2025, issued on 30 December 2025 and in force since 1 June 2026, replaces the 1985 UAE Civil Code. According to Charles Russell Speechlys, the new code largely preserves the decennial liability framework with a ten-year liability period, moves it to Articles 821 to 824, keeps any agreement to exempt or limit that liability void, and expressly excludes the decennial liability rules from the contractor-subcontractor relationship. That last point matters to main contractors: liability between you and your landscape subcontractor now rests on the subcontract, so write it down. Separately, DMT's Circular No. 9 of 2026, reported by Khaleej Times, replaces some phase closure permits with certified technical reports and makes consultants and contractors jointly liable for defects. This is general information, not legal advice; take advice on your own contracts.
- State the maintenance and defects period after handover in the contract
- Define planting defects and the replacement rule in writing
- Record the condition of the works at handover with photos and a signed snag list
- Put the liability terms between main contractor and landscape subcontractor in the subcontract
Maintenance After the Defects Period
Most developments need landscape maintenance long after the contractor's defects period ends, and continuity matters: the team that installed the irrigation knows where every valve is. Our commercial landscape maintenance contracts guide covers how to structure that contract and its service levels.
Conclusion
A landscape package that is scoped early, priced on full information, coordinated with the civil and MEP works, and handed over with clear defects and maintenance terms is far cheaper than one let late and fixed afterwards. Under the new Civil Code, main contractors should also make sure their subcontracts carry the liability terms they rely on. Petra Scape works as main contractor and as landscape subcontractor on residential, commercial and government projects in Abu Dhabi and Al Ain, covering softscape, hardscape, irrigation and maintenance. Send us your drawings, BOQ or tender through our company projects form, or read more about our commercial and government landscaping work.
Looking for a landscaping contractor for a commercial or government project?
We work as main contractor or landscaping subcontractor on commercial, government and residential developments in Abu Dhabi and Al Ain, and run annual maintenance contracts. Send us a BOQ or tender, or ask for our prequalification pack. Commercial projects.
Looking for a landscaping company in Abu Dhabi? See what we do in each city.
Sources
- Sahel Public Realm Rating System Handbook (draft) — Abu Dhabi Department of Municipalities and Transport (DMT)
- Abu Dhabi Launches the Livability by Design Framework for Every Major Urban Development (24 August 2026) — Abu Dhabi Department of Municipalities and Transport (DMT)
- Seasonal irrigation saves water in 2021 (22 April 2022) — Abu Dhabi Department of Municipalities and Transport (DMT)
- Abu Dhabi City Municipality tree planting along walkways (4 June 2026) — Abu Dhabi City Municipality
- The National In-Country Value (ICV) Program — UAE Government portal (u.ae)
- Construction Contract 2nd Ed (2017 Red Book), reprinted with 2022 amendments — FIDIC
- Client update on the new Civil Law in the UAE: Federal Decree-Law No. 25 of 2025 — Squire Patton Boggs (January 2026)
- Decennial liability and subcontractors under the new UAE Civil Code (Articles 821 to 824) — Charles Russell Speechlys (2026)
- Abu Dhabi replaces paper permits for buildings with digital reports under new directive — Khaleej Times (15 October 2026)
Frequently Asked Questions
What does a landscape works package include on an Abu Dhabi development?
Usually softscape (soil, trees, palms, shrubs, ground cover and turf), hardscape (paving, kerbs, walls, planters and shade structures), irrigation and its tie-ins to TSE or potable supply, lighting interfaces, any water features or play and sports areas, and maintenance through the establishment and defects period. The most important part of the package is the interface schedule: who provides sleeves, water and power points, drainage connections and protection of finished work.
Which design manuals apply to public realm landscaping in Abu Dhabi?
DMT's own documents reference the PR-401 Abu Dhabi Public Realm Design Manual and the ROW-603 Abu Dhabi Urban Street Design Manual. Since 24 August 2026, DMT's Livability by Design framework also applies to new or updated master plans for areas of more than 2,000 people. Estidama requirements apply to most developments. Confirm which documents your project's approvals refer to.
Does decennial liability apply to landscape subcontractors?
Under the new UAE Civil Code, Federal Decree-Law No. 25 of 2025, in force since 1 June 2026, the decennial liability rules keep a ten-year liability period between employer and contractor, but, according to Charles Russell Speechlys, they are expressly excluded from the contractor-subcontractor relationship. Liability between a main contractor and a landscape subcontractor therefore depends on the subcontract terms. This is general information, not legal advice.
How long is the defects period on landscape works?
It is whatever the contract says. Standard forms such as the FIDIC Red Book set the defects notification period in the contract data rather than fixing one figure, so state it in the tender along with the maintenance obligations, what counts as a planting defect and how replacements are handled.
Does ICV certification matter for landscape contractors in Abu Dhabi?
On many government and semi-government tenders, yes. The UAE Government portal states that certified companies gain advantages during the awarding of tenders and contracts based on their ICV score. Ask for the certificate at prequalification if your employer scores it.